Our role

Ashfold came to the Sloane Street project with the specific brief to ensure the work is carried out efficiently and to the clients’ timescale. We are currently working closely with the architects, our client and quantity surveyor and in the process of appointing a contractor with the relevant expertise.

Project details

Cadogan Estate are currently overseeing the installation of a new service lift for a designer clothes company in their Sloane Street store which occupies the ground, first and second floors of a Grade II listed building. The lift will be installed from the ground floor retail unit up through to the second floor where the client is installing a private space for client fittings and events. The office space is currently let to three tenants, none of whom expect to be disturbed by the works taking place below.

The internal alterations to the listed building require great attention to detail in consultation with structural engineers. The works will also be carried out when the building is unoccupied during evenings and weekends, which requires coordination with Cadogan Estate to gain site access and acoustic engineers to ensure that noise does not disturb active retail outlets below.

Statistics

  • Location: 192 Sloane Street, London
  • Budget: Confidential
  • Dates: 2018 – 2019
  • Project Team: Client – Cadogan Estates; Project Manager – Ashfold
    Construction Consultant – TTPP; Architect – Fielden & Mawson; Engineers – AKT2, PSH